The 1947 - Present Chevrolet & GMC Truck Message Board Network

The 1947 - Present Chevrolet & GMC Truck Message Board Network (https://67-72chevytrucks.com/vboard/index.php)
-   The 1973 - 1991 Blazers, Jimmys, and Suburbans Message Board (https://67-72chevytrucks.com/vboard/forumdisplay.php?f=37)
-   -   Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy (https://67-72chevytrucks.com/vboard/showthread.php?t=554172)

jkeating1 01-17-2013 10:39 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
The frame will be hell for stout the way you're doing it. Help me out in case I ever do one though---what would be wrong with a horizontal 2" sectioning of the stock frame? By the time it's welded full length, fishplated as necessary, and boxed, and maybe partially doubled, it seems like that would stiffen it up enough. (2" assuming you can get the 3/4" more you need out of body mount drop)

JK

67cheby 01-18-2013 10:16 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Quote:

Originally Posted by watahyahknow (Post 5823779)
i think the frame can be made quite a bit straighter you only need to get the bodymounts farther out

seen jessy james on one of his builds weld the frame on small box profile legs too the ramps of a four post lift to level it and keep it in place while he was cutting bending and welding on it (he was narrowing the front frame of an A ford) i was thinking of doing sumtin like that but only to fixate the frame with 2 3 foot beams about 4 inch square and some metal scrap to make some traingles and a few legs tackwelded to keep the frame floating in mid air after i cut it to put in the kick up for the diff as long as the tacks dont break i weld a little at the time at different places so it doesnt pull and the frame itself is straight to start with that should be enough

great idea
Quote:

Originally Posted by jtp67-72 (Post 5824780)

not bad, not bad ! thanks Jim
Quote:

Originally Posted by Scottshotrods (Post 5824802)
Not bad deals on those motors at all

Justin

i agree not to bad !
Quote:

Originally Posted by jkeating1 (Post 5824972)
The frame will be hell for stout the way you're doing it. Help me out in case I ever do one though---what would be wrong with a horizontal 2" sectioning of the stock frame? By the time it's welded full length, fishplated as necessary, and boxed, and maybe partially doubled, it seems like that would stiffen it up enough. (2" assuming you can get the 3/4" more you need out of body mount drop)

JK

great idea....hadnt thought of doing it that way !

67cheby 01-18-2013 10:17 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
a customer and friend from Tulsa has offered to let me borrow his frame table....so if i go that route maybe i can sneek a pic or two of the cool 67 stepside he is building !

fastcam1 01-18-2013 10:28 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
^^^^ do it!
Posted via Mobile Device

67cheby 01-18-2013 10:59 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
i have one other option also.....i might disclose in a day or two, as far as the frame goes !

thor 01-18-2013 11:30 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Quote:

Originally Posted by 67cheby (Post 5823651)
well after me a Chip stood around scratching our heads for an hour or so.... i am now thinking about building a frame table... LOL

I'm back to chanting, "Custom Frame! Custom Frame!" :thumbs: :lol:

67cheby 01-18-2013 11:31 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
LOL..you might just get your wish !

Portmod7 01-18-2013 12:24 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Keep up the good work lady and gentlemen, she's gonna be SWEET!

LEEVON 01-18-2013 12:29 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Mike, a full frame really is the only way to "one-up" Cloud 9. But I think you already know that : )

67cheby 01-18-2013 12:51 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Quote:

Originally Posted by Portmod7 (Post 5826035)
Keep up the good work lady and gentlemen, she's gonna be SWEET!

thank you !
Quote:

Originally Posted by LEEVON (Post 5826043)
Mike, a full frame really is the only way to "one-up" Cloud 9. But I think you already know that : )

Hmmmm....probably correct ......we will see

jkeating1 01-18-2013 01:36 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
I agree! All you have left that's not custom now is the section between the front and rear clips. However, if that doesnt come to pass, and you do use the rectangular tube within the modified factory rails---Those two long steel rect tubes would make hellacious concealed air tanks!

JK

jasonhall 01-18-2013 11:13 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Need to know more of this cool oklahoma truck !!!
Posted via Mobile Device

67cheby 01-19-2013 10:23 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Quote:

Originally Posted by jkeating1 (Post 5826224)
I agree! All you have left that's not custom now is the section between the front and rear clips. However, if that doesnt come to pass, and you do use the rectangular tube within the modified factory rails---Those two long steel rect tubes would make hellacious concealed air tanks!

JK

yes they would make some great air tanks !
Quote:

Originally Posted by jasonhall (Post 5827373)
Need to know more of this cool oklahoma truck !!!
Posted via Mobile Device

stay tuned ! according to my UPS tracking numbers there will be alot of new parts here on Monday !

thor 01-20-2013 01:28 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Quote:

Originally Posted by 67cheby (Post 5825896)
LOL..you might just get your wish !

:clap::clap::clap:

jlsanborn 01-21-2013 12:35 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Man your threads move fast! So is your build :metal:

That front end looks awesome - props to the fab dude. It's going to be sweet!

67cheby 01-21-2013 10:06 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
1 Attachment(s)
thanks guys ...well had a busy weekend and didnt get much done on Square Peg other then being rewarded by my patience......and alot of friends looking and trying to help, i got a text Sunday about a motor and trans , FINALLY the deal i had been waiting for 2001 5.3 motor and trans complete all accessories and wiring , 135k miles for $500 ! Thanks to my friends Chip and Brian for tagging along on a late night engine pickup we got back home at about 11:30 last night !

LEEVON 01-21-2013 10:10 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Wow, what a deal! Some poor dude is going to come outside this morning and his truck ain't gonna start because you stole that thing! (figuratively, of course).

67cheby 01-21-2013 10:15 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
LOL.....i was sure hoping that a "GREAT" deal like this would come along !

bagged74 01-21-2013 10:17 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
If my small block wasn't already at the engine builder this would have been in my blazer. Lol
Posted via Mobile Device

67cheby 01-21-2013 10:20 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
LOL, i am glad yours was at the engine shop !

Rusbuilt 01-21-2013 10:49 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Nice score!

67cheby 01-21-2013 11:26 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Thanks man , i am pretty pumped about it !

ls1s10 01-21-2013 11:47 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
nice build!

67cheby 01-21-2013 11:48 AM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Thank you man ! and welcome to the board !

NewType72 01-21-2013 12:04 PM

Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
 
Smokin deal I haven't yet seen a square with a vortec motor in it so maybe ill convince my father to swap out his tired ole' smog motor in his 73
Posted via Mobile Device


All times are GMT -4. The time now is 03:09 AM.

Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com