Re: The Toy Box
3 Attachment(s)
Quote:
About 2/3's done with it. Just need to finish wrapping doors and windows then can proceed. The heat will be a boiler system for the in floor heating. But $$$! Still finalizing details for gas and water install. It just got a bit nippy here the past few days, it cuts the chill for now....lol |
All times are GMT -4. The time now is 11:33 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com