Re: Project two tone.
Nice going TJ. Slowly going back to being a truck again! :metal:
|
Re: Project two tone.
Quote:
|
Re: Project two tone.
Looks great Brotha!!! Enjoy the coming year!!!
|
Re: Project two tone.
1 Attachment(s)
Thanks Brotha! :metal:
Little early, but Happy New Year folks! Tiny update to end the evening. :mm: Had a few minutes so I got my fuel pump mounted up and the rest of the line routed. She's set permanent folks! One more thing off the list. :bann: Later guyz. :chevy::gmc2: |
Re: Project two tone.
Do you have a build up on your motor or did I miss it. I am redoing my 65 ickup. It has had a stock 292 and 5 speed in it for about 20 years and want to update the motor. What did you use for pistons and a cam?
Thanks |
Re: Project two tone.
Quote:
Head work: 1.94 intake and 1.60 exhaust valves. Lump ports .030 shaved off the bottom BBC screw in studs Comp cams 1.75 ratio bbc roller rockers Z/28 valve springs Block work: zero decked .040 over ross forged aluminum pistons. .170 dish and 100+ grams lighter than stock Stock rods balanced and refitted with arp studs and bolts. Crank ground and balanced. Comp cams 268H 219@.050 .499 lift 110 lobe center Comp cams lifters Smith brothers pushrods. Aluminum timing gears Clevite rod, main, and cam bearings. Melling stock type oil pump. Misc: Clifford Intake and short tube headers 625 CFM demon carb DUI 50K HEI 12bolt.com finned aluminum valve cover. :chevy: |
Re: Project two tone.
Thanks. My head is the same as yours but didnt shave anything off it. What compression were the pistons? Do you know what final compression ratio is? Have you put any miles on the motor yet? Happy with it?
|
Re: Project two tone.
Quote:
|
Re: Project two tone.
Hi guys! Well it has been awhile since the truck has been touched. Weather took a turn for the worst and work was super slow.
Spring is around the corner and the weather should be getting better soon which means....Painting time! :metal: So plans are to fire up and break in the 292 sometime within the next two months. Shooting for May. Already getting the ball rolling. Got a list of the last needed parts to get her running and it's already getting smaller. :bann: Super excited about getting that motor running. This weekend I will be doing some small work on the truck. Today I picked up a new starter, hose fittings, fan belt, thermostat, and some other misc stuff. Parts are on the way from Classic Parts and should be here sometime this coming week. Also with the help of my dad I'll be setting the cab right side up on the stand to start working on the floor this weekend so I am excited about that! Hope to have the entire cab in primer late spring early summer and then onto painting. :metal: Lot's to do folks! Until next time! :chevy: |
Re: Project two tone.
Looking forward to the vroooooooooom:truck:
|
Re: Project two tone.
Quote:
|
Re: Project two tone.
Get after it Brotha!!! :metal:
|
Re: Project two tone.
Quote:
Hope you are doing well and they aren't working you to hard over there. :chevy: |
Re: Project two tone.
3 Attachment(s)
Hey guys! Few small updates to get the week started. :mm:
Since I am planning on getting this engine going soon I've been working on getting it finished so it can be ran. Lotta small stuff still needed to be done. Fan belt I had was too long so I got a shorter one and that takes care of That. lol See pic. Also got my new starter mounted up. Still debating on painting it black.....Thoughts????? Got some gasket maker and made some gaskets for the adapter plate and then purchased a 1/2 inch thick gasket for the carb mount. I'll show the reason for all that later this week. Had to raise the carb up a little. Anyhow....also got some brass 90's for the water heating jacket on the intake manifold so I can rout the water hoses better. Oh yeah, siliconed the thermo stat housing in place so that is on permanent. Well all this and not much was done, but it beats nothing at all. lol Should have some better updates this weekend as parts will be coming in and I'll be trying to spend most of the day working on the truck. Weather has been cold and nasty as well so time to get the wood stove fired up! Later guys! :chevy: |
Re: Project two tone.
Making progress! :metal:
|
Re: Project two tone.
Quote:
|
Re: Project two tone.
5 Attachment(s)
Afternoon Gents!
Through out the past week I have been tinkering with the 66. Weather has been bad so cab work has not happened, but parts have been coming in for the 66. :metal: Got my hei dizzy in and plug wires cut to size. Found this braided hose sleeving that I could not pass up so I have been braiding all the hoses. Not quite as good as the real thing.....but looks good none the less. Also got my lokar throttle cable mount installed. :chevy: |
Re: Project two tone.
1 Attachment(s)
Waiting on the lower rad hose which should be in tomorrow. Then I'll sleeve it up and install it.
Not much left to do to get this motor running. :bann: Also got the cab set upright again to start working on the floors. Waiting on decent weather now. All for now gents! :chevy::gmc2: |
Re: Project two tone.
:metal::metal::metal:
Awesome looking Brotha!!! Waiting on a running engine video... Diggin' those headers...:uhmk: |
Re: Project two tone.
T.J. I can't wait to hear that monster, I'm sure you can't wait either...Just takes time...
|
Re: Project two tone.
Can't wait to hear it fire up!!
|
Re: Project two tone.
Quote:
Quote:
Quote:
|
Re: Project two tone.
Your rolling stock looks really good TJ. I remember when I was working on my cab and you kept saying someday. Know you are there.
Bret |
Re: Project two tone.
Quote:
|
Re: Project two tone.
It will almost be a shame to cover that up with a body. Lookin good.
|
All times are GMT -4. The time now is 09:22 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com