![]() |
Estimate trucks build month? Flint assembly
Hi everyone, I’m restoring an 87 Chevy v10 and its original door jam sticker is missing. Doors were replaced at one point. I would like to get a new door jamb sticker printed but I’d like to know the build month/year first. It was built at flint and the sequential number is 3477XX. Any other 87 flint trucks have a sequence number near that one? Thank you!
|
Re: Estimate trucks build month? Flint assembly
1 Attachment(s)
Flint built 60 jobs per hour, two production shifts per day.
My '87 was built 9/29/86 and the VIN is 317xxx. K |
Re: Estimate trucks build month? Flint assembly
I assume you meant pick up truck.
Flint also built Blazer/Suburban on a separate line at 36 jobs per hour. K |
Re: Estimate trucks build month? Flint assembly
Quote:
|
Re: Estimate trucks build month? Flint assembly
So: 347,000 - 317,000 is 30,000 units.
60 per hour x 8 hours x 2 shifts is roughly 960 units per day (assuming no overtime and no breakdowns). 30,000 divided by 960 = 31.25 production days. Counting from 9/29 up 31 production days (assuming no weekend work) puts you on or around November 11, 1986. K |
Re: Estimate trucks build month? Flint assembly
1 Attachment(s)
Or - you could contact the GM Heritage Center and order the original invoice for your truck, which would have the information shown above including build dates, ship dates, option content, pricing plus any discounts, and selling dealership information.
K |
Re: Estimate trucks build month? Flint assembly
Quote:
|
Re: Estimate trucks build month? Flint assembly
Report back once you get it. I'm mildly curious to see how we did on our estimate.
K |
Re: Estimate trucks build month? Flint assembly
Quote:
|
| All times are GMT -4. The time now is 08:52 AM. |
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright 1997-2025 67-72chevytrucks.com