On Sat, I worked on my brick mailbox that a visitor @ my neighbors house knocked over. Tried to stack the top 2/3's of the structure back onto the bottom 1/3 of loose brick. It took some HD steel moving dolleys & my engine hoist to manuver it.
I was hoisting it up into position & the top buckled, then disintegrated

. Soooooo, then I started to disassemble it brick by brick. I wanted to see how much could be salvaged (going price for a brick/ double mailbox in my area is $625-725). I chipped away mortor all day long.... brick by brick.
Sunday, I went to a Circ Du Soleil show & then got home & watched the race that I recorded. Not much truck wise.