next step was to clamp a support on the rear cross member to keep from sagging, then install the C-notches (made from 7" schedule 40 pipe), with reinforcing boxing plates. Then fabing the cross member (from 1 5/8" tube) to support the air bags, and upper shock mounts (shock mounts not installed yet in pic). And an overall shot of the install.
|