Re: Project Penicillin~ 68 crewcab build up!
Finished the inside of the roof today and I am now starting on the drip rail on the pass side. It is real bad but not so much fromn rust just a bad install job. It curved in almost 1/2" tward the center and their was about 8" that was rusted out. The new section I am putting in is about 32" x 18ga.
Kevin
LFD Inc.
|