thats not just body work, thats from removing the first bolt to starting it. its all written and logged down how much time and what he did.
__________________
72 Blazer 3/4 ton running gear 4.10s NP205/TH350 350 4in lift half doors
71 C10 with 454
99 S-10 5.1L SBC 700R4
09 Malibu

Marshalltown, Iowa
|