View Single Post
Old 11-09-2007, 01:18 AM   #5
bulldozer
Registered User
 
Join Date: Apr 2006
Location: Lincoln Ca.
Posts: 6
Red face Re: 72 Longbed Drive Shaft

The expense for the bearing and carrier was only $32.00 at NAPA . and about 20 minutes to remove the driveline. I just need to get the old bearing off to make way for the new assembly. Just thought there might be an easy trick that I diddn't know about.
bulldozer is offline   Reply With Quote