View Single Post
Old 04-04-2008, 03:45 AM   #95
68 short step
Senior Member
 
Join Date: Aug 2005
Location: tulsa OK
Posts: 3,070
Re: project INCREDIBLE HULK

powerwashed the frame to keep my hands and the new parts from getting dirty during mock-up.. tore-off the front and rear suspension and got the bags (all 4 corners) installed, drilled the bag mounting plates for the front, installed the lower tubular control arms, located and drilled the shock mounts, and finally assembled it all for mock-up (less the muscle-bar sway bar)



68 short step is offline   Reply With Quote