grimss, i have no idea what greens those are.... might ask 71hulk....



got the air ride components all mounted..... tank is mounted under the cab, and the two compressors are about 1.5' behind that under the bed.. the valves are on the crossmember just behind the rear axle.... i ran the lines through the front crossmember and secured them by drilling and tapping a hole, installing a screw, and finally securing the line with a cushion clamp....it was time consuming, but i didnt want that line rubbing anything... next was time to mount the ride hight sensors.. where i mounted the sensors there was about a 1" gap that need a spacer made... so i got some round stock, cut it , drilled and tapped it, then welded it to the frame... it all came out looking good... here are a few pics...