Installed some Chrome goodies on the lowrider. Still have to install the DD Instrument cluster this week.
Still putting my air mgmt system together to install in the lowrider. Got front bags, brackets and air tank from Suicide Doors which is just right up the road about 30 minutes. Still need valves, air line, compressor, etc... before I can install them.
http://67-72chevytrucks.com/vboard/s...d.php?t=299003
Kenny