View Single Post
Old 07-18-2008, 11:24 PM   #7
MacAttack
283 Drama Queen
 
MacAttack's Avatar
 
Join Date: Dec 2004
Location: Surf City, CA
Posts: 2,435
Re: The 283 Rebuild Begins

Cut two 2x4's at 15 degrees and transferred the bolt pattern from the water pump mount points and drilled two 1/2" holes - then put two 3" long 3/8-16 bolts into the holes. Front "legs" done. Then I used the hoist to support the block level and cut two 4x4's. Straped the hole thing to a new pallet and I'm ready to go for the shop pick up of the engine at 8AM tomorrow!

__________________
For about 12 years of my adult life I had a severe speech impediment.
My ex-wife never let me get a word in edgewise.
MacAttack is offline   Reply With Quote