I was at the VP/ Varco-Pruden plant. A manufacturer of Pre-enginnered metal buildings. My job involves everything from design to installation of equiptment. I work out of the St. Joseph, Mo. plant and work for VP.
Sometimes I am sent to install new machines, retrofit old ones or in this case, train the maintenance crew and operators in repair and setup of existing machines.
They were doing maintenance at a cost of 36 hours. I showed them how to cut that to 5 hours.
Hopefully that will increase their productivity and make their lives a little easier.
They were great people to work with.