nothing really lately, i was working on fixing the rust on the 3rd door at the bottom, i got the rust spots cut on on the inside and outside and a friend borrowed my welder so im stuck with a hole in my door until i get it back lol. i did get about all my fittings put together last night. just waiting to do the leader hose for the comp and the pressure switch until i can figure where everything goes. im going to order my wiring kit for the switches tomorrow.
also, i got a quote from a local welding company for 18" long pipe and they said about $65, that includes cutting...but the biggest they had was 6.5"...which i dont think will work. that will only give me a 3.25" notch which is not worth it to me. and i dont even think 6.5" is big enough for my front bag cups
__________________
67 1/2 ton Suburban - Project DRGNWGN.
Build thread
-_--_--_ _________
_--_-_ -/____|__|__\__
,.,,,.,.,,.,|_O _______ O_]