View Single Post
Old 01-20-2010, 01:33 AM   #1
Dynomutt
Registered User
 
Dynomutt's Avatar
 
Join Date: Mar 2009
Location: North Texas
Posts: 440
a little time...

Found a little time to bang on some sheet metal last night and tonight. About 6 hours overall. Got the passenger side kick panel, A pillar, inner rocker with 4 inches of floor, front and rear supports all mocked up. Have a few minor "adjustments" to make on the inner rocker/floor but shouldn't be too bad. I welded in the kick panel but need to get some POR15 (or similar) to paint up in the A pillar and supports before I weld them up. If I can find some time tomorrow I'm hoping to get the rest of this side welded up so I can start on the driver side. Once I get both sides done I'll upright the cab so I can hang the doors to do the B pillars, outer rockers and cab corners. Have a couple of small floor patches that need to be done then too.

Got a lot more to do yet but progress none the less.

Here's a few pics for ya.
Attached Images
     
__________________
MARQ

Build Thread

http://67-72chevytrucks.com/vboard/s...d.php?t=446194
Dynomutt is offline   Reply With Quote