Re: What did you get done 2.14.10 valentines day edition
Ive been doing a lot of wire brushing, sand-blasting, and painting. So far got the axle, axle shafts, and steering knuckles done for my 86 3/4 4x4.
__________________
91 Silverado Regular cab, 2wd, swb-project truck
97 Silverado Extended cab, 2wd, swb-driver
|