Re: What did you get done 3/14/10 Pi day/ st pattys day edition
Finally got started on the vinyl siding for my garage. The first setback involved waiting on the addition to be completed. Problem number 2 came when I found out the siding (that would match the house) had been discontinued. Found some that is within 99.9% of matching so the back, front, and left side are done.
Met with a concrete contractor, getting ready to have 18 yards of concrete poured. Driveway to the garage and a 3 car pad in front of the garage. I'm stoked!
Checked the oil in the Heap, that was the extent of my "truck" stuff this weekend.
__________________
_____________________________
Bryan
'99 Silverado 1500, 4.3, 5-speed, reg cab, short bed
'50 Chevy 2DR Hard Top, 350/350, M2 Front End, 3:08 gear, cruiser.
'40 F**d Sedan, all Chevy power, Heidt's front end, TCI rear, nice driver.
|