View Single Post
Old 05-13-2010, 12:47 AM   #205
SCOTI
Registered User
 
SCOTI's Avatar
 
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 21,919
Re: Project: Recycle

That was the day shift.... now comes the night shift.

I finished up the reinforcement plates for the Dropmember R&P notches. These are pretty basic.... just some .1875" plates that mimic the frame rail & notch area. There will be one on each side of the rail 'sandwiching' the vertical portion of the frame rail.

I loosely installed the pass side plates to give an idea of what I'm doing. I'll drill the holes out tomorrow & install them w/some GRADE-8 hardware. As mentioned previously, this did require reshaping some of the vertical portion of the pass side rail so that everything was as flat as possible.

While it's still not bullet-proof, it's stronger than w/no reinforcements (whether they're necessary or not). Also, if you look closely @ the 2nd pic, you'll notice there's no longer the 'curled' portion of frame where the pass side rail transitions from vertical to horizontal @ the top of the rail....
Attached Images
   
__________________
67SWB-B.B.RetroRod
64SWB-Recycle
89CCDually-Driver/Tow Truck
99CCSWB Driver
All Fleetsides
@rattlecankustoms in IG

Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive.
It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar.....

Cubic inches is like Indiana Jones with a cheap pistol.
SCOTI is offline   Reply With Quote