that would be a no so smart idea.  it could be done but breaking the beads with hand tools would probly be an all day project, lol. go around to a few shops, good chance you'll find one that will do it for free. to do all 4 of them thats about 5 min worth of work with a rim clamp machine
__________________
'51 F100, backhalf with a narrowed 9 and coil overs, 18.5" mickeys, monte front clip, +400" sbc in the works
'05 1500 Crew Cab
RIP
'84 swb 5/7 drop, solid cammed 408 w/ fully ported dart heads, th350 w/ 10 inch hughes, 12 bolt w/ 3.73 richmonds and a locker
'80 swb 4x4 in progress: 7" lift, 350 th350/np205, d44 and 1.5" ORD tie rod, 14BFF w/discs , armored diff covers, 40" MTR's
|