Re: Project: 1967 C10 Small Window
At this point I was trying to get the front clip done. I was able to put all of the control arms into the sandblasting cabinet and cleaned up the front crossmember using the same process of grinding and sandblasting. I stopped by Outback and got all new shafts, stoppers, and U-bolts and painted those as well as the 2.5" drop spindles from ECE.
Last edited by David67; 08-08-2010 at 10:25 PM.
|