And fill the hole up with mud. We could get a mixer to this one, so we had sent the pump home after the first one. These holes took an even 10 yards of concrete each, with just enough rebar sticking out to get ahold of the beauty ring we'll put around them at finish grade. More of a mow strip, really.
These both will get some architectual steel elements welded to them, and then the generator. And that's the thing that drives me nuts-after all this, they are only putting a 1k generator on these. Not enough power to run anything. Oh, they will be hooked up to the grid, but all they are really designed to do is teach the kids about green energy, which is cool and all, but-dang!
They sure will look neat when they are done, though: