Thread
:
Project...praise the lowered
View Single Post
01-26-2011, 07:44 PM
#
11
(joey)
Registered User
Join Date: Aug 2008
Location: halifax nova scotia
Posts: 375
Re: Project...praise the lowered
got a little more done to the floor supports tonight.i ran some more 2x1 along the front of the floor and came off them with some 1x1 along where the tunnel is going to run.then i ran a couple pieces of 2x1 to tie together the outer and inner support which will act as a good mounting point for the seat.because i plan on laying on the sills, i bent up some 1/8 inner door sill plates with the right angle to run my sheet metal to the new supports.now a couple more braces then i can lay some sheet metal.
__________________
check out my build (the start of a shaved,channeled,bagged 67 gmc with a 01 gmc frame and drivetrain)
http://67-72chevytrucks.com/vboard/s...d.php?t=434253
Last edited by (joey); 01-26-2011 at
07:45 PM
.
(joey)
View Public Profile
Find More Posts by (joey)