I'm almost ready to slide the two halves together !!
Last night I took care of the last two items, before the final grinding/sanding of the surfaces.
First I removed the bottom plate for the sectioning:
-
-
-
Then came the tedious task of relocating the e-brake tubes....
-
-
-
-
Here is the LS e-brake tube protruding thru the rear frame horn ... The welds around this tube need to be cut, in order to slide the tubes back further.
-
-
-
Cut and then drill....
-
-
-
-
These clips were holding me up ... outta there !!
-
-
I pulled the tubes out, and after reshaping them, and cutting some slices I got them top feed smooth ...
-
-