View Single Post
Old 10-15-2011, 06:00 PM   #16
68C10HotRod
Registered User
 
68C10HotRod's Avatar
 
Join Date: Feb 2008
Location: Omaha, NE 68144
Posts: 333
Re: Project - FrankenBurb in NE

The 402 is getting built & almost done. He's waiting on me to bring him the intake (getting Ceramic Coated) & he'll finish putting it together. He discovered someone put a steel crank in it & the journals needed polished, the rockers were pretty wore out & he thought we should move from the 3/8 to 7/16 push rods & guide plates, a few valves were a little bent & needed new ones, but the bore took .030 over with ease. It should be back next week so look for pics.
__________________
Bryan
'52 Bel Air 2dr HT - in pieces
'68 C10 - 6cyl/4spd REMOVED, LT1/T56 to be installed

Any society that would give up a little liberty to gain a little security will deserve neither and lose both.” - Benjamin Franklin
"And those who know what's best for us, Must rise and save us from ourselves" - RUSH lyric (mockery)
68C10HotRod is offline   Reply With Quote