View Single Post
Old 02-19-2012, 05:10 PM   #2
rfmaster
Registered User
 
rfmaster's Avatar
 
Join Date: Oct 2003
Location: OC CA
Posts: 1,374
Re: what did you get done 2/19/2012 edition

Installed New Smog (AIR) pump and all the hoses. (It looks very official now)
Swapped out my stand by 10-SI for reworked 94AMP 12-SI Alternator (one of the three rectifier diodes went out).
Found out that Summit shipped out new Headman headers on Friday!! So all the plumbing work will have to be re-done once the new headers are installed.

//RF
__________________
"The Beast"

1975 Chevrolet C20 longbed
350/700R4! with 3inch body lift
Dual Flowmasters Super 40's!
TBI retrofit completed (2007-07-29)
New 383CID (+030) 08-304-8 9.5:1CR x36,005 (2012-12-17)
rfmaster is offline   Reply With Quote