Made some more progress on my 200-4r install today.
Would of finished and started Pressure testing, but I found that my "new" drive-shaft is 1" to short.
Sure it would move the truck, but the slip yoke is out 1.5" and I'm not willing to take any chances.
So I will dop it off to get re-tubed & balanced tomorrow.
Current drive shaft length 60" need to be 61". (this is just the shaft not including the slip yoke.)
This is what I DID get done today.

Finished plumbing cooling lines

Installed the TV made EZ kit

Installed the brake pedal lock up release switch

Installed and calibrated the Trans dipstick tube

Installed and calibrated custom shift linkage

Installed the trans temp gauge.
Full details will be in my Photo build thread
Photo Build Thread - Page 2
Sneak peak images....



It was a productive day.......
-=Scott=-