Thread
:
My 1966 stepside build..............slowly coming together.
View Single Post
05-13-2012, 11:05 AM
#
53
blackdawg
Blackdawg
Join Date: Aug 2010
Location: North Delta ,British Columbia
Posts: 213
Re: My 1966 stepside build..............slowly coming together.
Here are the pics.all the battery cables are heavy duty cable.All new wiring was run for the engine harness.all connections were soldered and wrapped.This is a part of the build i had someone
come in to do for me.On my ride there was alot of wiring running around from the previous po.Everything has been cleaned up under the hood.Engine fired up oil pressure came right up.Thats the part that freaks you out.This is my first engine build in 20 years.I have to change the throttle linkage a bit and start hunting down the exhaust leak.Most likely from the headers but could be coming from where the header meets the lake pipes.And damm those lake pipes sound good.Last step once i make sure all the little leaks are taken care of engine will need to be set up.So that it runs abit more smoothly.But it is a great feeling to get to this
step.Now i can move this thing around a bit let it see the light of day.So there is my progress.
__________________
LIFE NEEDS NO RED LIGHTS !!
1966 chevy stepside. Aka Bella.
1998 chevy s-10 4x4 daily driver.
my build thread
http://67-72chevytrucks.com/vboard/s...d.php?t=467164
blackdawg
View Public Profile
Visit blackdawg's homepage!
Find More Posts by blackdawg