from yesterday....
added a few extra pieces of square tube to box in the top and make it stronger

2.5- 1lb rolls of welding wire, 7.25- 6ft sticks of 1.25" square tube, a bunch of cutting & fitting, a bunch welding, and this how far i made it framing up a steel floor for the back of my suburban. need to get some more wire and steel when i come back home in 6-7 weeks so i can do some more of framing up of the floor lol