Really tough past 4 days.
Thursday and Friday I built all 4 walls and lined up all the material.
Saturday AM we lifted walls, sheeted and braced everything. We set 4 rafters and called it a day. Temps were in the 90's with high humidity. That took a toll on everybody!!
Sunday we set the rest of the rafters, sheeted a row and cross braced everything.