View Single Post
Old 12-08-2013, 02:13 PM   #90
rwade
Registered User
 
rwade's Avatar
 
Join Date: Apr 2010
Location: Louisiana
Posts: 970
Re: My 72 with 405/25/24's

I welded some 2" square tubing between the step notches, then bought some generic mounting tabs and welded them to the 2" square tubing in front. Just raising the factory location at the top.

Wade
rwade is offline   Reply With Quote