Re: 1970 SWB : Porterbuilt to the Extreme "Double E"
- My short term goals are to have the driveshaft shortened and installed by next week.
- The cab on in the next two weeks, this depends on if I want to patch the upper cab while laying on the back which sounds like the best option considering the stories ive heard from doing it over head. If I decide to flip it over then it may be 3 weeks or so before I can get the cab mounted.
- Get the gas lines finalized within the same timeframe.
|