Re: 1970 SWB : Porterbuilt to the Extreme "Double E"
I went out to check some measurements before taking the drive shaft to the drive train shop tomorrow. At a ride height around 5" the transmission is between 5* and 6 * down. The rear end is around 10* to 11* down. with the rough dimensions that Bennett68C10 gave me and my mock up dims I should have a new driveshaft by next week. I only wish the carrier bearing mount for the center brace was between the ladder bar perches. In order to use the two piece drive shaft I have I will have to weld a brace in.
|