Re: 55-1 Floor Replacement Absolute Sheetmetal

We have the left side kick panel repaired and the toe board support in place. The toe board support is welded in and left as you see it. Absolute says to lay the toe board on top and do a lap weld on each side. Next I set the rear floor support in place and laid the floor pan and toe board in and tacked the toe to the firewall. When it comes time to weld you will run a bead down the toe support outside and inside. across the bottom inside and out and up on the top inside and out. The floor is welded in with a series or roset welds across the back and on the floor support.