Thread: Cab supports
View Single Post
Old 03-02-2014, 12:42 PM   #10
dougf
Registered User
 
dougf's Avatar
 
Join Date: Aug 2012
Location: Fort Campbell, KY
Posts: 494
Re: Cab supports

To do my front right cab support, footwell, floor pan took me probably 30 hours of work. I made sure everything lined up, and slowly ground away metal. Plus I had to fabricate the s channel support that the cab mount bolt goes through, which took a lot of time. I still havent done the rocker panel backing plate and rocker panel. No time now that I work so much. I agree that the top banana parts i bought were great. Good luck!
dougf is offline   Reply With Quote