Re: Looking for planning help for polebarn style workshop to be built in the spring
lets do some quick math, using menards pricing...
25 30ft trusses $3125
156 2x6x12 studs $1248
3 layers 2x6 top plate $312
120 sheets 1/2'' osb $1080
18 squares shingles $1800
total to rough in 30x48 shop $7565
granted i have not included: fasteners, doors, windows, siding, tar paper, soffit/fascia and lots of miscellaneous stuff
but it won't come close to the $13,835 difference in price from a steel building
8' o/c columns means you'll have 4 columns down the center of your shop
all their doors are non insulated
they have an addition cast of $1152 to add bubble wrap to your shop roof (roof only)
steel buildings are not easy to insulate without studding up interior walls
and you still need to supply a level building site, concrete slab, all utilities, electrical, heat, plumbing, etc...
AND unless you live in a double wide you'll have a steel building next to you for ever
Last edited by _Ogre; 11-06-2014 at 06:06 PM.
|