View Single Post
Old 11-09-2014, 07:36 PM   #300
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,017
Re: 48 Burb, bagged, 5.3, 20 year wait

Thanks Bigtoe and Marc.

Bigtoe-waited for me to redo the direction we were taking the wheel tubs or....?

This was a week end with many diversions from shop time.... good diversions... with Grandson's and yard work with wife.

Left wheel tub fits well and needs a little trimming before welding. Before doing that, we will finish the right one and position both left and right the same distance to the side wall.

Right side - trimmed to scribed line, wife held in place for aligning and tacking, some hammer and dolly work for alignment and finished first pass with short stitch welds.
Attached Images
     
Advanced Design is offline   Reply With Quote