The heater box, heater hoses, firewall insulating pad, and seat went in over the weekend. The outlet plenum was plastic and in bad shape so I will need to fabricate one to match up with the ducts.
I started wiring up the gauge panel this afternoon along with figuring out the seat belt mounting locations. The gauge surround is autometer with VDO gauges in it.