Re: Winter Project... Shop Build Tread
Insulation and metal. This is/was or seemed to be the most time consuming part of the whole project. 5 guys worked 7 hard days straight to get it in the dry. It was cold and windy which killed productivity. Temps during this time ranged from 5-25 degrees. And to top it off we had a threat of an impending major snow storm hanging over our heads. The guys for sure earned their pay these days. The metal is 100% screwed on. No nails in the metal anywhere. In the end I have a very snug shop.
Due to the impending snow storm, I had the garage door guy show up early to get the doors in. 2 days with 2 guys to install 4 doors and 3 openers. I didn't have a 4th opener installed on the door that is only the loading dock door.
|