View Single Post
Old 06-17-2016, 12:23 AM   #21
Sicksty8
Registered User
 
Sicksty8's Avatar
 
Join Date: Jun 2015
Location: Winnipeg, Mb
Posts: 137
Re: Run Away's '69 C10 LWB Project Log

Quote:
Originally Posted by Run Away View Post
Sweet! I just read your full thread, it pretty much mirrors what I've been planning. Knowing what you know now, would you do the full floor again or patch? I keep flip flopping as to what direction I want take. Patch or replace the whole thing.
I think I'd do the full floor because it meant less spot welds to cut out but at the point that you are at, I dont think it would make much of a difference. When I bought the floor it was also cheaper than buying all the patches, braces, and supports individually. The only bad part was getting it to fit right because I didn't take enough measurements. Kinda biased because I havent done the patch panel method but for me it made more sense.
Sicksty8 is offline   Reply With Quote