Re: Lks Dcvn - 1972 2WD Blazer Build
To make the tub swap easier and to make future work on this truck a bit easier as well - I picked up a MaxJax 2 post lift for my 3rd bay garage. The lift uses epoxy and anchors drilled into my garage floor and can be moved to multiple locations if needed. I installed a second set of anchors in my other larger garage so I can move the lift between those spaces depending on what work I am doing.
|