October 28, 2016
The Tanks Inc. large capacity generic Mustang style tank was installed, the Corvette regulator mounted and lines bent this week.
The steering column to rack connection was finalized this week also. I'm using polished parts. The engine mounts had only been tacked which turned out to be a good thing as the engine had to be shifted slightly forward for final clearance.
And finally, Fedex dropped off the Vintage Air AC kit while I was there this afternoon. So that will be the main effort this coming week.
I've gotta get the trans cover to verify there's clearence.
I've asked Mike to install a square tube or bar INTO the cab B pillar to serve as reinforcement for the shoulder belt mount. - If anyone has a photo of the interior of the B pillar I'd love to see it. I know its layers of folded sheet metal but not sure what space is available in there for a tube or bar?
There needs to be some kind of work done on the inner fenders to finish off the appearance of the cut outs for the A arms.
Mike will fabricate a radiator/core support cover from aluminum that will be polished later.
That's about it. Then the entire frame will be torn down for sandblast and powder coat. The chassis will be re-assembled, the body returned to the paint shop. Then the body will be re-mounted and the whole truck returned to Mike for final electrical and trouble shooting.