View Single Post
Old 05-01-2017, 04:47 PM   #4
toolboxchev
Registered User
 
Join Date: Jul 2015
Location: 2nd left past the stump on a dirt road.
Posts: 2,629
Re: When a 2hr job turns into a 4 day job :(

Hit them with PB Blasters then heat with a torch, repeat at least 3 times.

I had a piece of farm equipment that took an acetylene torch and in addition to the above I shocked it with a cold water hose after oil and heat process.

I got that bugger off there!
toolboxchev is offline   Reply With Quote