I have surplus copper, I have no problem "sweating" copper fittings.
The pour went well, concrete supplier did not arrive until 10 Am, all went well the last truck went home with about a 1/3 yard in the barrel. The south side of the pad is 6" from the fence, so it is shaded and took longer to set. After all the strike joints were done and a light broom, wait 2 hrs and cover with orange blankets and turn out the lights.
Next focus is membrane the exterior install windows and vinly siding tim faciA. then wireing, sheet the walls with waffer paint and rock on,

buy the way how do I move photos from a smart phone to this forum? Where do I get fittings that will mate the pex to conecting