Re: 2019 Goals and Plans
1. Fix the rear main leak and add a manual choke to the 1bbl on the 77, take it to Lapeer Dragway and make 1 day of 22 second passes. Then sell it.
2. Finish assembling the 250 on the stand.
3. Pull the 2 ton outta the field, convert the frame to a frame jig, and build the cab into a gasser.
__________________
1987 2 ton
1982 250/TH350 beater in progress
Dad's 1981 3/4 L6 3 on tree posi and no options, awaiting restoration or scrapping
Plus a mess o' tractors
|