Quote:
Originally Posted by NoNeck
Chad and I were able to get the 90's model bed off and begin the process of cleaning 50 years of south Georgia sand from the frame.
Next step is lowering the rear, C-Notch the frame and add an adjustable track bar and performance shocks. Axles will be swapped out for new 5 lug versions and rear Disc Brakes.
A Boyd's Welding EFI tank is being fabricated and should arrive by the end of the month. The ACC medium blue loop high hump carpet came today and looks great.
One step at a time.
POP
|
Great idea on the bed lift
Ingenewity and Top Level planning
Yeah I had to look up how to spell that word
.