View Single Post
Old 07-08-2004, 04:02 PM   #1
Mountain Man
Registered User
 
Join Date: Jan 2002
Location: Calgary, Alberta, Canada
Posts: 451
Project 72 - Body work pics from today

Well, now that I finished the mechanical and interior, my project 72 is now in the body shop. It will need another week and a half of body work, but at least they have started with it. They are doing things properly, by taking it down to metal. I have bought and left them with cab corner patch panels, as well as front fender patch panels. They are working from the top down, and will take the box off tomorrow to start the cab corner repairs. I am hoping to get it back fully painted in original two tone scheme with the original medium blue and white colors in base/clear - by the end of July. I will be putting on all the trim myself.


__________________
72 C10 Cheyenne Super
Full trim
Factory tach dash
A/C dash
Factory tilt
350 / 350 power train - with Edelbrock components.
Mountain Man is offline   Reply With Quote