View Single Post
Old 07-28-2004, 09:19 PM   #1
BaggedC10
Under construction!
 
BaggedC10's Avatar
 
Join Date: Aug 2002
Location: NorCal
Posts: 1,065
Arrow Updated pictures.....











High-temperature ceramic coating on the catalytic converter heat shield.


Everthing is bolted to the frame using zinc plated Grade-8 hardware, except the front Cool-Ride kit. Waiting to be installed (Still waiting on the UPS man) is the following:





Front and rear disc brake upgrades from Stainless Steel Brakes Corporation and Belltech 3" spindles. More mods. coming soon but they will remain a secret.....
__________________
2001 Silverado bagged on 22's. *Sold*
BaggedC10 is offline   Reply With Quote