Bit of a hectic day.
Fitted at 07.30 this morning with Mickey’s help lifting it in.
Had to use a small hydraulic bottle jack to push the front feet open about 15mm that the heat distortion had created.
Bolted down.
Pretty (very) happy with the overall look.
Closer to my visualisation than I deserve.
Most importantly was getting it to lean back to mimic the “B-post on the entrance/door.
Rear supports hardly impair load area. So some practicality retained.
Unobtrusive from the front.
This is a great point to have made it to in my opinion from where it started.
How much further before the final straight??
.