Quote:
Originally Posted by mongocanfly
If you have it to that point on the frame, that's where I'd go from, much easier to access it there..I used steelbraided line and -an fittings on mine, but I ran the whole length from pump with it..
Just do yours where it's easy to get to the transition
|
Thanks for the reply. Yeah, that is what I am trying to plan/figure out, is how far up off the frame to bring the hard line before transitioning. The motor trans aren't currently installed so I don't really know what obstacles I need to avoid in my routing.